Public Notice of the First Public Participation in the Environmental Impact Assessment for the 530-Ton-Per-Year Intermediate and Veterinary API Production Project of Shandong Qihui Chemical Co., Ltd.
2025-12-26
Shandong Qihui Chemical Co., Ltd. annual production of 530-ton Intermediate and Veterinary API Production Project Notice of the First Public Participation in the Environmental Impact Assessment
According to the Ministry of Ecology and Environment The Measures for Public Participation in Environmental Impact Assessment, promulgated on January 1, 2019 (Ministerial Order No. 4), stipulates that Shandong Qihui Chemical Co., Ltd. shall, with respect to Shandong Qihui Chemical Co., Ltd. Annual output 530-ton Intermediate and Veterinary API Production Project 》Relevant information is disclosed in accordance with the law, as follows:
I. Project Name and Overview
Project Name: Annual output 530-ton Intermediate and Veterinary API Production Project
Construction Site: Zibo City, Shandong Province West end of Wei Liu Road, Qilu Chemical Industrial Park, Linzi District Shandong Qihui Chemical Co., Ltd. Within the existing plant area
Main Construction Contents and product solutions : Within the original plant site, the main facilities to be constructed include a veterinary‑medicine workshop, a Class A warehouse, a fire‑pump house, a control room, and an electrical distribution room. Various pieces of production equipment will also be procured, such as reactors, spray‑drying towers, three‑stage filters, metering tanks, and drying units. ; Relying on existing auxiliary facilities and environmental protection facilities . Upon completion, the project will have an annual production capacity of amoxicillin sodium. 180 tons, ampicillin sodium 180 tons, sodium isooctanoate 130 tons, cloxacillin sodium 40 tons.
Nature of the project: Renovation
II. Name and Contact Information of the Project Owner
Construction Unit: Shandong Qihui Chemical Co., Ltd.
Unit Address: Zibo City West end of Wei Liu Road, Qilu Chemical Industrial Park, Linzi District
Contact and Contact Method of tying: Wang Longyue 13964360463
III. Introduction to the Evaluation Agencies Undertaking Environmental Impact Assessment Work
Environmental Impact Assessment Agency: Shandong Meiling Zhonglian Environmental Engineering Co., Ltd.
Mailing Address: Shandong Province Qiling Road, Linzi District, Zibo City No. 56
IV. Procedures for Environmental Impact Assessment and Main job responsibilities
The environmental impact assessment procedure for this project is as follows:
( 1) Verify the industry category of the proposed project against the filing documents.
( 2) In accordance with the “Catalogue for Categorized Environmental Protection Management of Construction Projects” (2021 Edition), it is determined that the proposed project shall prepare an Environmental Impact Assessment Report.
( 3) Review and organize the basis for preparing the proposed project, including relevant laws and local policies.
( 4) Based on the process data of the proposed project, identify characteristic pollutants and determine the environmental impact assessment factors, assessment levels, applicable standards, and other relevant elements.
( 5) Review the enterprise’s existing projects, verify their compliance, and analyze the compliance of pollutant emissions and concentrations during the operational phase.
( 6 ) Based on the investigation of the current environmental quality and the analysis of pollution sources associated with the project and its surrounding area, to carry out Environmental Impact Prediction ;
( 7) Based on the forecast results Based on the results of public participation surveys, provide an assessment of the project’s environmental feasibility and propose environmental protection measures and recommendations.
The main scope of work for the environmental impact assessment of this project is:
( 1 ) Current environmental quality in the project area and analysis of regional pollution sources ;
( 2 ) Predict the environmental impacts during the construction and operational phases of the project. ;
( 3 ) Propose environmental protection measures and other strategies to address the potential environmental impacts of the project.
V. Main Issues for Public Consultation
( 1) Are you aware of or familiar with the projects being developed in this region?
( 2) Are you satisfied with the current status of the surrounding environmental quality?
( 3) The impact of the project’s completion on local economic development;
( 4) Environmental impacts during the project’s construction phase;
( 5) Environmental impacts following project completion;
( 6) Attitude toward the construction of this project;
( 7) What suggestions and requirements do you have for the project’s construction?
VI. Main Methods for the Public to Submit Comments
The primary means for the public to submit comments: The public may, from the date of this information disclosure, … Within 10 working days, To our organization via telephone, email, and other means Please share your views and comments on the project’s construction and its environmental impact assessment, and provide your contact information. The environmental impact assessment agency will accurately document the public’s opinions and suggestions in the project’s Environmental Impact Report and convey these valuable inputs to the project’s developer, design firm, and relevant authorities.
- Public Participation Download Link
If the public has any comments regarding the construction of this project, they may download them via the online link. Fill out the “Public Opinion Form,” online link. The reply is:
Link : https://pan.baidu.com/s/1y31dcxXuknSeIfnkgqbbAA
Extraction code : 7bu
2026-04-20
2026-04-24
Main industrial applications of formaldehyde
2026-05-14